Freshly installed white kitchen with a navy island and range hood

Cabinet Installation

Installed by the Family That Designed It.

The last step is the one most companies hand off. We don't. Your kitchen is set by our own Finemark crew — a family-led team — with a member of our family working right alongside our installers on every job, down to the final door adjustment.

Or call: (630) 733-7700

Our Own Hands

No subcontractors. Just our family.

A beautiful kitchen can be undone by a careless install. That's why we never hand this part to a rotating crew of subcontractors. The same family that designs and orders your cabinetry installs it — measuring, setting, and adjusting every piece by hand.

A member of our family works right alongside our installers on every job, so the people accountable for the result are the ones in your home. And when the work is done, we finish with a complimentary cleanup of the work area.

How Long It Takes

Most kitchens install in a matter of days.

Once your cabinets arrive, we typically begin installation within one to three days. From there, install time depends on the size and detail of the kitchen:

Small kitchen

1–2 days

A galley or single-wall layout with a straightforward run of cabinetry.

Mid-size kitchen

2–3 days

The typical L- or U-shaped kitchen with an island and a mix of base, wall, and tall cabinets.

Large kitchen

3–5 days

A large footprint with extensive cabinetry, detailed trim, and multiple zones. Fully custom or very large projects can run up to about a week.

These timelines are typical and subject to change depending on project size, complexity, and our current workload and schedule. We'll give you a specific, realistic plan for your kitchen during your consultation.

Start to Finish

What installation looks like.

01

Delivery & inspection

Your cabinets arrive and we inspect every box before a screw goes in — catching anything before it reaches your wall.

02

Set & level

Boxes are hung and set dead-level and plumb, shimmed and secured so doors and drawers line up for the life of the kitchen.

03

Fillers, panels & trim

Scribe fillers, end panels, toe kick, light rail, and crown are fit to your walls — the finish carpentry that makes it look built-in.

04

Doors, drawers & hardware

Every door and drawer is hung, then adjusted by hand until the reveals are even and everything glides shut softly.

05

Walkthrough & cleanup

We walk the finished kitchen with you, fine-tune anything that needs it — then finish with a complimentary cleanup of the work area.

The Result

Level doors, even reveals, soft-close everything.

A look at the kind of cabinetry we set in kitchens across Chicagoland's western suburbs. Tap any image to enlarge.

Ready when your cabinets are.

Start with a conversation about your kitchen — and meet the family who will design, build, and install it, start to finish.

Or call: (630) 733-7700